Ningbo Construction subsidiary wins 465 million yuan Sichuan Mianyang water resources upgrade EPC project

中国证券报··Read original
2▲1 ▼0Impact / 5
Summary · why it matters

Ningbo Construction announced that a consortium formed by its controlled subsidiary Ningbo Municipal Engineering Construction Group and Sichuan Heyixin Engineering Survey and Design Company has won the design and construction EPC project for the water resources upgrade in Tashan area, Santai County. The winning bid price is 465 million yuan. The project is located in Santai County, Mianyang City, Sichuan Province. Construction includes renovating 382.67 kilometers of channels, building 84 kilometers of patrol roads, upgrading 2,517 small structures, and comprehensively treating 10 kilometers of river channels, with a construction period of 720 calendar days. In the consortium, Ningbo Municipal Engineering Construction Group acts as the lead party responsible for construction general contracting, while Sichuan Heyixin is responsible for design work. As of the announcement date, the formal contract has not yet been signed, and there is uncertainty regarding contract signing and performance.

Impact on assets 1

Others▲ · 1 stocks

Theme Impact 1

Off-coverage companies 1

宁波市政工程建设集团有限公司Private▲ Positive
Demandrelevance

As lead contractor in consortium, secures major construction project.

Related news

Thailand
3

Bangkok fixes flood relief registration system, 35,800 applications filed

The Bangkok Metropolitan Administration has completed repairs to its online registration system for flood victims seeking assistance, and about 35,800 people have now registered. Lalida Periswiwatana, deputy spokesperson for the Prime Minister's Office, said Bangkok is accelerating drainage in the eastern areas, particularly Min Buri, Nong Chok, Prawet, Saphan Sung, Sai Mai and Lat Krabang, and is mobilising water pumps and water-pushing boats to help. Wissanu Charoen, director of the drainage system engineering division at the Bangkok Metropolitan Administration's Drainage Office, said the urgent operation is focused on reclaiming the Rom Klao community housing area in Lat Krabang district, where the water level has been reduced by about 30 to 60 centimetres, though roads in the area are still flooded by about 20 to 30 centimetres. Yesterday the Bangkok Metropolitan Administration added more flood barriers and installed additional water pumps, and expects to lower the water level by about 25 centimetres per day, with roughly two more days needed to return the area to normal. In the Sai Mai–Ao Ngoen area, the situation is expected to ease within about two days. People who have already registered and wish to correct their information can log in to the system to update it, or contact their district office during official working days and hours.
About megatrends
Climate Adaptation & Water › Drought, Wildfire & Flood Resilience Regulation
Climate Adaptation & Water › Pipe, Stormwater & Smart Metering Regulation
Read original ↗
Money & Banking·2dRead more →
Thailand

Bangkok cancels Bueng Khu Bon and Bueng Bang Chan monkey-cheek projects, citing poor value for 11 billion baht

The Bangkok Metropolitan Administration has confirmed the cancellation of the Bueng Khu Bon and Bueng Bang Chan monkey-cheek flood-retention projects, saying they are not worth the roughly 11 billion baht budget. Jesada Chantraprapha, deputy permanent secretary of the Bangkok Metropolitan Administration, said the two ponds can hold only 700,000 cubic metres of water, compared with about 5 million cubic metres managed by Bueng Nong Bon, or roughly ten times more, and that Bueng Nong Bon is also connected to the tunnel system and main canals. He also insisted that no private party received any undue benefit. Chawalit Chantararat, a water management expert and chief executive of TEAM GROUP, said Bueng Khu Bon has a design capacity of about 870,000 cubic metres but can actually manage only around 500,000 cubic metres, and that when the current land price and the cost of building all the associated systems are combined, the cost framework for the Khu Bon project comes to about 11 billion baht. The Bangkok Metropolitan Administration is therefore laying out a plan to develop the eastern drainage system as an integrated whole, running through Khlong Phraya Suren, Khlong Sam Wa, Khlong Saen Saep and Khlong Prawet Burirom, linking to Bueng Nong Bon, the drainage tunnel and a large pumping station, while taking in more water from Min Buri, Bang Kapi, Lat Krabang and Rom Klao.
About megatrends
Climate Adaptation & Water › Water Utilities & Infrastructure Capital
Climate Adaptation & Water › Drought, Wildfire & Flood Resilience ▼Capital
Climate Adaptation & Water › Pipe, Stormwater & Smart Metering Capital
Read original ↗
InfoQuest·3dRead more →
United States
▲

Badger Meter Launches OneNetwork Platform at WEFTEC

Badger Meter launched OneNetwork, a real-time monitoring and analytics platform designed to unify fragmented water and wastewater system data, at the WEFTEC conference in New Orleans. The company's share price has fallen 27.6% year to date, with a 1 year total shareholder return down 28.6%, though the 5 year total shareholder return of 26.6% still points to longer term gains. The most followed narrative places Badger Meter's fair value at $169, above the last close of $127.77, framing OneNetwork as part of a wider digital push alongside the BlueEdge platform and expansion beyond the meter. That narrative cites intensifying water scarcity, mounting regulatory pressure, and mandates for real-time monitoring as drivers of shorter replacement cycles and pricing power. Supply chain and tariff pressures, along with any slowdown in core utility water projects, could weaken that upbeat case.
About megatrends
Climate Adaptation & Water › Pipe, Stormwater & Smart Metering ▲Technology
Smart City / Autonomous Infrastructure › Smart Metering & Grid Edge ▲Technology
Climate Adaptation & Water › Water Treatment & Flow Technology ▲Technology
BMI · Technology · Positive Badger Meter launched the OneNetwork real-time monitoring and analytics platform at WEFTEC, a new product development.
Read original ↗
Simply Wall St·3dRead more →
United States
▲

Aqua Pennsylvania Buys Ulster Municipal Water Systems for $0.5 Million

Essential Utilities subsidiary Aqua Pennsylvania has acquired the water system assets of the Ulster Municipal Authority in Bradford County for $0.5 million, adding 180 customers to its existing water customer base. Aqua Pennsylvania plans to invest $2 million over the next five years to upgrade the acquired assets, modernizing facilities and replacing aging lines to provide safe, high-quality water for Ulster residents. Essential Utilities has added more than 138,000 customers or equivalent dwelling units and about $570 million of rate base through acquisitions since 2015, and its proposed merger with American Water Works remains targeted for the first quarter of 2027. Signed purchase agreements represent more than 200,000 customers and about $282 million in purchase price, while the active municipal acquisition pipeline is about 400,000 customers. Separately, California Water Service Group has agreed to acquire Nexus Water Group's Nevada and Oregon water and wastewater systems for $218 million, and Select Water Solutions has agreed to acquire Pilot Water Solutions for $700 million plus up to $15 million in contingent consideration.
About megatrends
Climate Adaptation & Water › Water Utilities & Infrastructure ▲Capital
Climate Adaptation & Water › Regulated Water & Wastewater Utilities ▲Capital
Climate Adaptation & Water › Pipe, Stormwater & Smart Metering ▲Capital
WTRG · Capital · Positive Subsidiary Aqua Pennsylvania acquired Ulster Municipal Authority water assets for $0.5 million, adding 180 customers and $2 million planned upgrades.
CWT · Capital · Positive Agreed to acquire Nexus Water Group's Nevada and Oregon water and wastewater systems for $218 million.
Nexus Water Group · Capital · Positive Agreed to sell its Nevada and Oregon water and wastewater systems to California Water Service Group for $218 million.
WTTR · Capital · Positive Agreed to acquire Pilot Water Solutions for $700 million plus up to $15 million in contingent consideration.
AWK · Capital · Neutral Mentioned only as Essential Utilities' proposed merger partner, targeted for Q1 2027; no new development.
Read original ↗
Zacks Investment Research·3dRead more →
Thailand
▲

Asia Plus flags 165-billion-baht water megaproject as boon for contractors CK, STECON, UNIQ, ITD

Research by Asia Plus Securities assesses that a water management megaproject with a combined value of 165,000 million baht will support the growth of the construction contracting sector over the medium to long term. The project aims to cut flood damage by about 16,930 million baht per year and reduce flooded area by 3.48 million rai. Construction is expected to begin in 2027 and take eight years. Among the stocks expected to benefit, Asia Plus names CK as its top pick with a target price of 24 baht on the prospect of winning work directly, while STECON carries a target price of 23 baht on expectations it will benefit from large project contracts. Also in the frame are UNIQ, which has opportunities from large project work, and ITD, which is involved in earthworks and drainage systems. In the construction materials group, SCC, SCCC and TPIPL stand to benefit from project demand for materials. Factors to watch include the project's funding sources, land expropriation, the timing of bidding, and contract signing, all of which will affect progress and the chances that construction companies win work from the project.
About megatrends
Climate Adaptation & Water › Drought, Wildfire & Flood Resilience ▲Demand
Climate Adaptation & Water › Pipe, Stormwater & Smart Metering ▲Demand
CK.BK · Demand · Positive Asia Plus names CK as top pick with 24 baht target on prospect of winning work directly from the 165-billion-baht water megaproject.
ITD.BK · Demand · Positive ITD is named as involved in earthworks and drainage systems for the water management megaproject.
STECON.BK · Demand · Positive STECON carries a 23 baht target on expectations it will benefit from large project contracts in the water megaproject.
SCC.BK · Demand · Positive SCC stands to benefit from project demand for construction materials.
SCCC.BK · Demand · Positive SCCC stands to benefit from project demand for construction materials.
UNIQ.BK · Demand · Positive Asia Plus flags UNIQ as having opportunities from large project work in the 165-billion-baht water management megaproject.
Read original ↗
thunhoon.com·4dRead more →
Thailand
▲5

Cabinet approves Chai Nat–Pa Sak drainage canal megaproject worth 165 billion baht, bidding to open in 2027

The Cabinet has approved the Chai Nat–Pa Sak–Gulf of Thailand flood diversion canal project, with total investment of approximately 165 billion baht, one of Thailand's largest megaprojects in years. The project aims to create a new water diversion route from the upper Chao Phraya basin directly to the Gulf of Thailand, improving drainage efficiency and reducing flood risk in the central region, Bangkok, and surrounding provinces. The government estimates that once completed, it will reduce flooded area by about 3.48 million rai, add roughly 1.555 billion cubic metres of water storage capacity, and cut economic damage from flooding by about 16.93 billion baht per year. Under the implementation timeline, feasibility studies and design are set for 2026, with construction of phase one beginning in 2027. From 2028 to 2030, the drainage canal, sluice gates, and land acquisition will be carried out. From 2031 to 2033, main structures will be built and systems tested, before full operation in 2034. Asia Plus Securities said the construction contracting group will be the first direct beneficiary, with CK, STECON, and UNIQ standing out as stocks with strong potential to win contracts, while ITD is likely to benefit from its expertise in earthworks and drainage systems. The construction materials group, including SCC, SCCC, and TPIPL, will see support later in the materials usage cycle. Factors to watch are clarity on funding sources, the land acquisition or expropriation process, and the timetable for opening bidding on each contract, with delays in these steps posing a key risk that could push the transmission of benefits later than planned.
About megatrends
Climate Adaptation & Water › Drought, Wildfire & Flood Resilience ▲Demand
Climate Adaptation & Water › Pipe, Stormwater & Smart Metering ▲Demand
CK.BK · Demand · Positive Asia Plus Securities names CK among contractors with strong potential to win contracts in the 165-billion-baht canal megaproject.
STECON.BK · Demand · Positive STECON is named among contractors with strong potential to win contracts in the approved canal megaproject.
ITD.BK · Demand · Positive ITD is cited as likely to benefit from its expertise in earthworks and drainage systems for the approved canal project.
SCC.BK · Demand · Positive SCC is named in the construction materials group expected to see support later in the project's materials usage cycle.
SCCC.BK · Demand · Positive SCCC is named in the construction materials group expected to see support later in the project's materials usage cycle.
UNIQ.BK · Demand · Positive Asia Plus Securities flags UNIQ as a construction contractor with strong potential to win contracts in the approved Chai Nat–Pa Sak drainage canal megaproject.
Read original ↗
Kaohoon·5dRead more →