Olympic Circuit Signs 36.842 Million Yuan Wastewater Treatment Station M&E Installation Contract

证券时报··Read original
2▲1 ▼0Impact / 5
Summary · why it matters

Olympic Circuit announced it plans to sign an engineering contract with related party Guangdong Shunkong Shunshui Construction for the mechanical and electrical equipment installation project of the wastewater treatment station at the Xinchuang Zhizai new factory. Shunkong Shunshui will undertake the project on a lump-sum basis, with a total project cost of 36.842 million yuan including tax.

Impact on assets 1

Others▲ · 1 stocks